SAN JOSE
DATA CENTER

400 Holger Way, San Jose, CA 95134
Evoque’s San Jose cloud-enabled data center services the south of Silicon Valley and has been upgraded to exceed earthquake-resistant standards and is situated just 5 miles from the San Jose Mineta International Airport.

Evoque San Jose Highlights
DATA_CENTER_ICONS-01

76,410

Square Foot
Data Center

DATA_CENTER_ICONS-02

23,415

Square Foot
Raised Floor

DATA_CENTER_ICONS-03

300

Square Foot of
Cage Capacity

DATA_CENTER_ICONS-04

99.999%

SLA of Power, Network,
Bandwidth

EVOQUE SAN JOSE

400 Holger Way, San Jose, CA 95134

1.3MW of power is generated onsite utilizing fuel cells to reduce carbon emissions. Evoque San Jose has multi-cloud connectivity, low-latency Internet connectivity, and high-speed connections to Evoque's other data centers.

  • 76,410 sq. ft. data center; 23,415 sq. ft. of raised floor
  • Standard cabinet: 45U 42" deep 4 & 6 kW
  • Standard cage capacity: Up to 300 W/sq. ft.
  • Higher densities with build to suit
  • Cloud-enabled with Evoque Connectivity Suite and Megaport
  • 99.999% SLA on power, network and bandwidth
  • Seismic Zone 4
Download the brief
EVOQUE_DC_CONNECT

CONNECTIVITY

  • Cross Connect: Copper, Fiber & Coaxial
  • Cloud Connectivity: Evoque Cloud Connect, Megaport
  • Internet Connectivity: Evoque Blended IP, Carrier-neutral
  • AT&T (LNS, SBC), Comcast, ExteNet (Hudson Fiber), Lumen (CTL, Level 3), Zayo
  • Point-To-Point Services: Evoque Regional Connect, Evoque Extend Connect
EVOQUE_DC_SECURITY

SECURITY

  • 24x7 onsite staffing
  • 24x7 closed circuit monitoring, with AI
    presence detection and 90-day storage
  • Minimum of three levels of physical security, including mantrap
  • Access control with card, bio-scanner or  Mobile device NFC authentication
EVOQUE_DC_POWER

POWER & COOLING

  • 2N UPS redundancy
  • Utility Feeders: 2
  • Standby Power Config: N+1
  • Three x 1.5 MW Diesel Generators
  • 1.3 MW Fuel Cell
  • VAC Distribution: N+1
  • Chillers: N+1
  • Three 270 & Two 50 Ton units
  • VESDA smoke detection
  • Data Center Areas: Pre-action dry pipe

Certified to Meet Or Exceed Rigorous Environmental and Management Standards

  • PCI-DSS
  • ISO 27001
  • SOC 1 Type I
  • SOC 2 Type I & II
  • SOC 3
  • ISAE 3402
  • CDCMP Certified
  • Enabling HIPAA, NIST-800 & PCI
SAN_JOSE_DATA_CENTER_IMAGES

CLOUD-ENABLED DATA CENTERS

Evoque’s competitive pricing, unmatched flexibility, uncompromising security evolve with our customer’s needs from one generation of their business to the next. Cabinet to cage, private suites to build-to-suit, we provide best-in-class infrastructure that scales.

DALLAS - WEBB CHAPEL DATA CENTER
X
  • 140,654 Sq. Foot, N+1 Data Center
  • Cloud Connect- AWS, Azure, GCP 
  • OnNet Carriers- AT&T, Lumen, ExteNet, Spectrum, …

Built for your Industry

Interested In Exploring An Evoque Data Center?

Whether you would like a quote, a tour, have
questions about our data center specifications,
our solutions experts are here to help.

Ask an Infrastructure Expert